Triple

T9468243
Position Surface form Disambiguated ID Type / Status
Subject NCEES FE Reference Handbook E228327 entity
Predicate instanceOf P0 FINISHED
Object exam reference manual C2889 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: exam reference manual
Context triple: [NCEES FE Reference Handbook, instanceOf, exam reference manual]
  • A. reference book chosen
    A reference book is a comprehensive, systematically organized source of factual information designed to be consulted for specific topics rather than read straight through.
  • B. engineering examination
    An engineering examination is a formal assessment that evaluates a candidate’s understanding and application of engineering principles, problem-solving skills, and technical knowledge within a specific engineering discipline.
  • C. reference document
    A reference document is an organized, authoritative source of information designed to be consulted as needed for specific facts, standards, or procedures rather than read sequentially.
  • D. instructional manual
    An instructional manual is a structured document that provides step-by-step guidance, explanations, and reference information to help users correctly and safely operate, assemble, or understand a product, system, or process.
  • E. standardized exam
    A standardized exam is a formal test administered and scored in a consistent, uniform manner to measure individuals’ knowledge, skills, or aptitude against common criteria.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca846fee388190a6ec273fd644b88b completed March 30, 2026, 2:10 p.m.
Created at: March 30, 2026, 7:53 p.m.