Triple
T9460548
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Helmand River |
E228133
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Grishk Dam
Grishk Dam is a hydroelectric and irrigation dam located on the Helmand River in southern Afghanistan.
|
E804177
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Grishk Dam | Statement: [Helmand River, hasDam, Grishk Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Grishk Dam Context triple: [Helmand River, hasDam, Grishk Dam]
-
A.
Edea Dam
Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
-
B.
Peligre Dam
Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
-
C.
Koronowo Dam
Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
-
D.
Daivões Dam
Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
-
E.
Gotvand Dam
Gotvand Dam is a major rock-fill embankment dam in southwestern Iran, built on the Karun River for hydroelectric power generation, irrigation, and water regulation.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Grishk Dam Triple: [Helmand River, hasDam, Grishk Dam]
Generated description
Grishk Dam is a hydroelectric and irrigation dam located on the Helmand River in southern Afghanistan.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Grishk Dam Target entity description: Grishk Dam is a hydroelectric and irrigation dam located on the Helmand River in southern Afghanistan.
-
A.
Edea Dam
Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
-
B.
Peligre Dam
Peligre Dam is a major hydroelectric and irrigation dam in central Haiti that forms Lake Péligre and plays a key role in the country’s power supply and water management.
-
C.
Koronowo Dam
Koronowo Dam is a hydroelectric and flood-control dam in northern Poland that creates the Koronowo Reservoir on the Brda River.
-
D.
Daivões Dam
Daivões Dam is a hydroelectric dam located on Portugal’s Tâmega River, forming part of the Tâmega electroproduction system.
-
E.
Gotvand Dam
Gotvand Dam is a major rock-fill embankment dam in southwestern Iran, built on the Karun River for hydroelectric power generation, irrigation, and water regulation.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca843b123881909b0e60028475d12d |
completed | March 30, 2026, 2:10 p.m. |
| NER | Named-entity recognition | batch_69cd7fcaf610819092bcd3b871665aa5 |
completed | April 1, 2026, 8:27 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d139e6cc888190a2175149c59bb138 |
completed | April 4, 2026, 4:18 p.m. |
| NEDg | Description generation | batch_69d13bc8ce4081909a58db4014f2748d |
completed | April 4, 2026, 4:26 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69d13c58beb08190ab41485bc7dd9b6d |
completed | April 4, 2026, 4:29 p.m. |
Created at: March 30, 2026, 7:52 p.m.