Triple

T944302
Position Surface form Disambiguated ID Type / Status
Subject Sandford Fleming Building E20377 entity
Predicate instanceOf P0 FINISHED
Object engineering building C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering building
Context triple: [Sandford Fleming Building, instanceOf, engineering building]
  • A. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • B. building section
    A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
  • C. engineering library
    An engineering library is a specialized collection of technical resources, including books, journals, standards, and digital tools, that support research, education, and practice in engineering disciplines.
  • D. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • E. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b0270c81909e6c9ce310f6aa55 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.