Triple
T9433496
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coyote Springs, Nevada |
E227442
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | golf resort development |
C19963
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: golf resort development Context triple: [Coyote Springs, Nevada, instanceOf, golf resort development]
-
A.
golf course complex
A golf course complex is a large recreational facility that includes one or more golf courses along with supporting amenities such as a clubhouse, practice areas, pro shop, and often dining or lodging services.
-
B.
golf destination
chosen
A golf destination is a location or resort specifically designed to attract golfers by offering high-quality courses, related amenities, and complementary leisure or travel experiences.
-
C.
resort developer
A resort developer is an entity responsible for planning, financing, designing, and overseeing the construction and operation of resort properties to create profitable, attractive destinations for leisure and tourism.
-
D.
golf course chain
A golf course chain is a business entity that owns, operates, or franchises multiple golf courses under a unified brand, management structure, and service standards.
-
E.
public golf course
A public golf course is a recreational facility with a series of golf holes, open to the general public for play, typically for a daily fee without requiring membership.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8437a7ac81908651de48f2d2141d |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:49 p.m.