Triple
T9413679
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LDPE-3A |
E226762
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Long Duration Propulsive EELV Secondary Payload Adapter mission |
C26099
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Long Duration Propulsive EELV Secondary Payload Adapter mission Context triple: [LDPE-3A, instanceOf, Long Duration Propulsive EELV Secondary Payload Adapter mission]
-
A.
expendable launch system
An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
-
B.
expendable launch vehicle
An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
-
C.
Spacelab subsystem
A Spacelab subsystem is a distinct functional component of the Spacelab space laboratory that performs specialized tasks—such as power, life support, data handling, or experiment support—to enable and sustain scientific operations in orbit.
-
D.
space station resupply vehicle
A space station resupply vehicle is a spacecraft designed to transport cargo, equipment, and sometimes crew to and from an orbiting space station, supporting its ongoing operations and maintenance.
-
E.
ISS external payload
An ISS external payload is a scientific or technological instrument package mounted on the outside of the International Space Station to conduct experiments, observations, or demonstrations in the space environment.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca843280488190bc65600e843ef9e6 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:47 p.m.