Triple

T9413679
Position Surface form Disambiguated ID Type / Status
Subject LDPE-3A E226762 entity
Predicate instanceOf P0 FINISHED
Object Long Duration Propulsive EELV Secondary Payload Adapter mission C26099 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Long Duration Propulsive EELV Secondary Payload Adapter mission
Context triple: [LDPE-3A, instanceOf, Long Duration Propulsive EELV Secondary Payload Adapter mission]
  • A. expendable launch system
    An expendable launch system is a type of launch vehicle designed for a single use, where major components are not recovered after delivering payloads such as satellites or spacecraft into orbit or on a trajectory.
  • B. expendable launch vehicle
    An expendable launch vehicle is a rocket designed for a single use to deliver payloads such as satellites or spacecraft into space, after which its components are discarded rather than recovered or reused.
  • C. Spacelab subsystem
    A Spacelab subsystem is a distinct functional component of the Spacelab space laboratory that performs specialized tasks—such as power, life support, data handling, or experiment support—to enable and sustain scientific operations in orbit.
  • D. space station resupply vehicle
    A space station resupply vehicle is a spacecraft designed to transport cargo, equipment, and sometimes crew to and from an orbiting space station, supporting its ongoing operations and maintenance.
  • E. ISS external payload
    An ISS external payload is a scientific or technological instrument package mounted on the outside of the International Space Station to conduct experiments, observations, or demonstrations in the space environment.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca843280488190bc65600e843ef9e6 completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:47 p.m.