Triple

T9409922
Position Surface form Disambiguated ID Type / Status
Subject South Bull Wall E226678 entity
Predicate instanceOf P0 FINISHED
Object sea wall C3669 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: sea wall
Context triple: [South Bull Wall, instanceOf, sea wall]
  • A. seawall chosen
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • B. sea fort
    A sea fort is a fortified structure built on or near the sea, typically on artificial islands, rocks, or coastal waters, designed to defend harbors, coastlines, or strategic maritime routes.
  • C. sea cliffs
    Sea cliffs are steep, often vertical rock faces formed along coastlines by the erosive action of waves, weathering, and geological uplift.
  • D. sea-washed lighthouse
    A sea-washed lighthouse is a solitary beacon tower built directly on a rock or small reef in the open sea, continually battered by waves and isolated from the shore.
  • E. barrier beach
    A barrier beach is a long, narrow, offshore deposit of sand or sediment that runs parallel to the coastline, protecting the shore from waves and storms while creating sheltered waters behind it.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca843280488190bc65600e843ef9e6 completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:47 p.m.