Triple

T939632
Position Surface form Disambiguated ID Type / Status
Subject Grevelingendam E20274 entity
Predicate partOfProject P10 FINISHED
Object Dutch Delta Plan E18527 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dutch Delta Plan | Statement: [Grevelingendam, partOfProject, Dutch Delta Plan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dutch Delta Plan
Context triple: [Grevelingendam, partOfProject, Dutch Delta Plan]
  • A. Delta Works chosen
    Delta Works is a vast system of dams, storm surge barriers, and other hydraulic structures in the Netherlands designed to protect low-lying areas from the sea and river flooding.
  • B. Stormvloedkering Hollandse IJssel
    Stormvloedkering Hollandse IJssel is a major storm surge barrier in the Netherlands that protects low-lying areas along the Hollandse IJssel river from flooding as part of the Delta Works.
  • C. Dutch Water Line inundations
    The Dutch Water Line inundations were a strategic flooding of low-lying land in the Netherlands used as a defensive measure to halt invading forces, notably during the Franco-Dutch War.
  • D. Zuidasdok infrastructure project
    The Zuidasdok infrastructure project is a major Dutch urban development and transport initiative to upgrade Amsterdam’s southern business district by expanding road and rail capacity and transforming Amsterdam Zuid station into a key national and international hub.
  • E. Oosterscheldekering storm surge barrier
    The Oosterscheldekering storm surge barrier is a massive movable flood defense structure in the Netherlands, renowned as the largest and most complex component of the Delta Works coastal protection system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493b0270c81909e6c9ce310f6aa55 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b38b7da08190ac0853655dab678a completed March 1, 2026, 9:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac119a80e08190b0179f8d413e06fd completed March 7, 2026, 11:52 a.m.
Created at: March 1, 2026, 7:40 p.m.