Triple
T9380755
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Finnieston Crane |
E225775
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cantilever crane |
C26049
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cantilever crane Context triple: [Finnieston Crane, instanceOf, cantilever crane]
-
A.
gantry crane
A gantry crane is a type of overhead crane that straddles its workspace on legs or supports, moving along rails or wheels to lift and transport heavy loads.
-
B.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
-
C.
canopy crane site
A canopy crane site is a research area where a large crane provides access to the forest canopy, enabling detailed study and monitoring of treetop ecosystems and processes.
-
D.
aerial lift
An aerial lift is a mechanical device, such as a cable-suspended chair, gondola, or platform, used to transport people or materials above the ground, typically in construction, maintenance, or recreational settings.
-
E.
crane operator
A crane operator is a skilled worker who controls and maneuvers cranes to lift, move, and position heavy materials safely and precisely on construction or industrial sites.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca842e9dcc8190a264119e683cfe04 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:44 p.m.