Triple
T9364287
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Watzmann traverse |
E225360
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | alpine ridge traverse |
C23418
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: alpine ridge traverse Context triple: [Watzmann traverse, instanceOf, alpine ridge traverse]
-
A.
mountain trail
A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
-
B.
alpine climbing area
An alpine climbing area is a high-altitude mountain environment offering established routes on rock, snow, and ice, typically requiring technical gear, route-finding skills, and awareness of rapidly changing weather and objective hazards.
-
C.
mountain pass
A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
-
D.
backcountry hiking trail
A backcountry hiking trail is a remote, minimally developed path through natural landscapes that offers challenging terrain, limited amenities, and opportunities for solitude and wilderness exploration.
-
E.
ridge climb route
chosen
A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca842bdd648190904131d58620d448 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:42 p.m.