Triple

T9350834
Position Surface form Disambiguated ID Type / Status
Subject Saint Petersburg Dam E225013 entity
Predicate instanceOf P0 FINISHED
Object flood protection barrier C18289 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: flood protection barrier
Context triple: [Saint Petersburg Dam, instanceOf, flood protection barrier]
  • A. movable flood barrier
    A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
  • B. water barrier
    A water barrier is a structure, material, or system designed to prevent or control the passage, infiltration, or flow of water between distinct areas or environments.
  • C. flood control facility chosen
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • D. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • E. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca842abfd48190949d71c3b86eeba8 completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:41 p.m.