Triple
T9336558
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | KS Toruń (speedway) |
E224657
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | motorcycle speedway team |
C27047
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: motorcycle speedway team Context triple: [KS Toruń (speedway), instanceOf, motorcycle speedway team]
-
A.
motorcycle stunt team
A motorcycle stunt team is a coordinated group of riders who perform choreographed, high-skill maneuvers and tricks on motorcycles for entertainment, competition, or demonstration.
-
B.
motorcycle racer
A motorcycle racer is a professional or amateur athlete who competes in high-speed motorcycle competitions, skillfully maneuvering bikes on tracks or courses while balancing speed, control, and safety.
-
C.
factory-backed motorsport team
A factory-backed motorsport team is a racing organization that receives direct financial, technical, and logistical support from an automobile manufacturer to develop and compete with its vehicles.
-
D.
motorcycle racing circuit
A motorcycle racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure designed specifically for competitive motorcycle racing.
-
E.
road cycling team
A road cycling team is an organized group of cyclists, support staff, and management that competes in road bicycle races under a shared identity, strategy, and sponsorship.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84286fcc81909f6e7fd7a7e862a2 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:40 p.m.