Triple

T9322164
Position Surface form Disambiguated ID Type / Status
Subject Manila–Hong Kong E224294 entity
Predicate instanceOf P0 FINISHED
Object air corridor C2156 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: air corridor
Context triple: [Manila–Hong Kong, instanceOf, air corridor]
  • A. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. national airspace
    National airspace is the three-dimensional region of the atmosphere above a country's territory and territorial waters over which that nation exercises legal jurisdiction, regulation, and control of aircraft operations.
  • C. airport runway
    An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
  • D. air
    Air is the invisible, odorless mixture of gases—primarily nitrogen and oxygen—that surrounds the Earth and is essential for breathing, weather, and sound transmission.
  • E. regulated airspace chosen
    Regulated airspace is a defined volume of the atmosphere where aircraft operations are subject to specific rules, restrictions, and oversight by aviation authorities to ensure safety and orderly traffic flow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8426d48481909596360f7791c7dd completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:38 p.m.