Triple

T9317740
Position Surface form Disambiguated ID Type / Status
Subject Symphony No. 52 in C minor (Haydn) E224165 entity
Predicate finaleKey P84749 FINISHED
Object C minor LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: C minor | Statement: [Symphony No. 52 in C minor (Haydn), finaleKey, C minor]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finaleKey
Context triple: [Symphony No. 52 in C minor (Haydn), finaleKey, C minor]
  • A. tonalityOfFinale chosen
    Indicates the specific tonal quality or key in which the final section or ending of a work is set.
  • B. finalSong
    Indicates that a song is the last or concluding piece within a sequence, collection, or performance.
  • C. finalMovementKey
    Indicates that one movement in a sequence is designated as the last or concluding movement, often used as a key or reference to the final step in a process or animation.
  • D. hasFinaleMovement
    Indicates that one entity (typically a musical work or performance) includes another entity as its concluding or final movement.
  • E. finalConcert
    Indicates that an event is the concluding or last concert in a series, tour, or sequence of performances.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8425f4fc81909c1c586e9a5b7530 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd358b66148190a918c107490c8406 completed April 1, 2026, 3:11 p.m.
PD Predicate disambiguation batch_69cc7a61e9a4819096eb014f3791ef2e completed April 1, 2026, 1:52 a.m.
Created at: March 30, 2026, 7:38 p.m.