Triple

T9309975
Position Surface form Disambiguated ID Type / Status
Subject UN General Assembly resolution A/RES/57/199 E223981 entity
Predicate monitoringApproach P88002 FINISHED
Object preventive visits rather than reactive complaints LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: preventive visits rather than reactive complaints | Statement: [UN General Assembly resolution A/RES/57/199, monitoringApproach, preventive visits rather than reactive complaints]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: monitoringApproach
Context triple: [UN General Assembly resolution A/RES/57/199, monitoringApproach, preventive visits rather than reactive complaints]
  • A. monitoringBody
    Indicates that one entity is responsible for overseeing, supervising, or tracking the activities, performance, or compliance of another entity.
  • B. canBeMonitoredWith
    Indicates that one entity is suitable or able to be observed, tracked, or supervised using another specified entity or method.
  • C. monitoringOutput
    Indicates that one entity observes, records, or tracks the performance, behavior, or results produced by another entity or process.
  • D. monitoredFor
    Indicates that one entity is being observed or tracked over time to detect, assess, or manage the occurrence or progression of another entity (such as a condition, event, or risk).
  • E. managementApproach
    Indicates the strategy, methods, or style used to direct, organize, and oversee the activities or resources of an entity or process.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8425f4fc81909c1c586e9a5b7530 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd20ac17488190aa6acf7a61420632 completed April 1, 2026, 1:42 p.m.
PD Predicate disambiguation batch_69cc7a61e9a4819096eb014f3791ef2e completed April 1, 2026, 1:52 a.m.
PDg Predicate description generation batch_69cc955a38108190b602d1e73725f11b completed April 1, 2026, 3:47 a.m.
Created at: March 30, 2026, 7:37 p.m.