Triple
T9299245
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NASA flight test operations |
E223718
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flight test operations |
C27167
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flight test operations Context triple: [NASA flight test operations, instanceOf, flight test operations]
-
A.
flight test center
A flight test center is a specialized facility where aircraft, spacecraft, or related systems are systematically tested, evaluated, and validated under controlled conditions to ensure performance, safety, and regulatory compliance.
-
B.
flight test engineering course
A flight test engineering course teaches the principles, methods, and tools used to plan, conduct, analyze, and report aircraft and aerospace system flight tests.
-
C.
flight simulation facility
A flight simulation facility is a specialized environment equipped with advanced simulators and support systems that replicate real-world aircraft operations for pilot training, research, and systems testing.
-
D.
orbital test flight
An orbital test flight is an initial or experimental space mission conducted to evaluate a spacecraft’s performance, systems, and safety while achieving and operating in Earth orbit.
-
E.
naval air operation
A naval air operation is a coordinated military action involving aircraft launched from or supported by naval forces to achieve objectives at sea, in the air, or on land.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8423edb08190bc0c91287a484768 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:36 p.m.