Triple
T929850
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Services Industriels de Genève |
E20065
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public utility company |
C5072
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public utility company Context triple: [Services Industriels de Genève, instanceOf, public utility company]
-
A.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
B.
natural gas utility
A natural gas utility is a regulated service provider that supplies, transports, and distributes natural gas to residential, commercial, and industrial customers through an integrated pipeline infrastructure.
-
C.
telecommunications company
A telecommunications company is an organization that provides communication services such as voice, data, and video transmission over wired or wireless networks to individuals and businesses.
-
D.
company
A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
-
E.
infrastructure management company
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493af3dc48190adb7263e6e445ea1 |
completed | March 1, 2026, 7:29 p.m. |
Created at: March 1, 2026, 7:40 p.m.