Triple

T9296232
Position Surface form Disambiguated ID Type / Status
Subject Fukushima Daiichi Nuclear Power Plant E223644 entity
Predicate previousRegulator P59373 FINISHED
Object Nuclear and Industrial Safety Agency E223648 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nuclear and Industrial Safety Agency | Statement: [Fukushima Daiichi Nuclear Power Plant, previousRegulator, Nuclear and Industrial Safety Agency]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nuclear and Industrial Safety Agency
Context triple: [Fukushima Daiichi Nuclear Power Plant, previousRegulator, Nuclear and Industrial Safety Agency]
  • A. Nuclear and Industrial Safety Agency chosen
    The Nuclear and Industrial Safety Agency was Japan’s former government body responsible for overseeing nuclear power safety and industrial regulation, notably scrutinized for its role during the Fukushima Daiichi nuclear disaster.
  • B. Nuclear Installations Safety Division
    The Nuclear Installations Safety Division is a technical division of the American Nuclear Society focused on the safety analysis, design, and operation of nuclear facilities.
  • C. Defense Nuclear Facilities Safety Board
    The Defense Nuclear Facilities Safety Board is an independent U.S. federal agency that oversees and advises on safety standards and practices at Department of Energy defense nuclear facilities.
  • D. Department of Nuclear Safety and Security
    The Department of Nuclear Safety and Security is the division of the IAEA responsible for establishing international safety standards and providing guidance and support to ensure the safe and secure use of nuclear technology worldwide.
  • E. Nuclear Regulation Authority (Japan)
    The Nuclear Regulation Authority (Japan) is the national regulatory body responsible for overseeing nuclear safety and regulation in Japan, established in response to the Fukushima Daiichi nuclear disaster.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: previousRegulator
Context triple: [Fukushima Daiichi Nuclear Power Plant, previousRegulator, Nuclear and Industrial Safety Agency]
  • A. formerlyRegulatedBy chosen
    Indicates that an entity was previously subject to the authority or control of a particular regulator, but is no longer regulated by that entity.
  • B. primaryRegulator
    Indicates that one entity serves as the main controlling or governing authority over another entity or process.
  • C. previousGoverningBody
    Indicates that one governing body served in authority immediately before another specified governing body.
  • D. regulatorEstablished
    Indicates that an entity has formally created, instituted, or set up a regulatory body or authority.
  • E. previousRegistration
    Indicates that an entity has been registered at an earlier time or in a prior instance relative to the current context.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8423edb08190bc0c91287a484768 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd089c9c588190967404c9eb938dfb completed April 1, 2026, 11:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0b248f99c8190a617b1d676799c75 completed April 4, 2026, 6:40 a.m.
PD Predicate disambiguation batch_69cc7a5aeb748190afb89c6bbd2a6d6f completed April 1, 2026, 1:52 a.m.
Created at: March 30, 2026, 7:36 p.m.