Triple

T9296231
Position Surface form Disambiguated ID Type / Status
Subject Fukushima Daiichi Nuclear Power Plant E223644 entity
Predicate regulatoryAuthority P4784 FINISHED
Object Nuclear Regulation Authority of Japan E223649 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nuclear Regulation Authority of Japan | Statement: [Fukushima Daiichi Nuclear Power Plant, regulatoryAuthority, Nuclear Regulation Authority of Japan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nuclear Regulation Authority of Japan
Context triple: [Fukushima Daiichi Nuclear Power Plant, regulatoryAuthority, Nuclear Regulation Authority of Japan]
  • A. Nuclear Regulation Authority (Japan) chosen
    The Nuclear Regulation Authority (Japan) is the national regulatory body responsible for overseeing nuclear safety and regulation in Japan, established in response to the Fukushima Daiichi nuclear disaster.
  • B. Tokyo Electric Power Company
    Tokyo Electric Power Company is Japan’s largest electric utility, internationally known for operating the Fukushima Daiichi nuclear plant involved in the 2011 nuclear disaster.
  • C. Fukushima Daiichi Nuclear Power Plant
    Fukushima Daiichi Nuclear Power Plant is a coastal Japanese nuclear power station in Ōkuma, Fukushima Prefecture, widely known as the site of the 2011 reactor meltdowns following a massive earthquake and tsunami.
  • D. National Land Agency of Japan
    The National Land Agency of Japan was a former government body responsible for national land-use planning, development, and coordination before its functions were absorbed into the Ministry of Land, Infrastructure, Transport and Tourism.
  • E. Water and Disaster Management Bureau of Japan
    The Water and Disaster Management Bureau of Japan is a governmental body responsible for planning and implementing policies on water resources, flood control, and disaster prevention across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8423edb08190bc0c91287a484768 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd089c9c588190967404c9eb938dfb completed April 1, 2026, 11:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0b248f99c8190a617b1d676799c75 completed April 4, 2026, 6:40 a.m.
Created at: March 30, 2026, 7:36 p.m.