Triple

T9288538
Position Surface form Disambiguated ID Type / Status
Subject National Grid plc E223457 entity
Predicate gridCodeAuthority P87431 FINISHED
Object Great Britain Grid Code
The Great Britain Grid Code is a technical regulatory framework that sets out the rules and standards for operating, maintaining, and developing the electricity transmission system in Great Britain.
E790449 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Great Britain Grid Code | Statement: [National Grid plc, gridCodeAuthority, Great Britain Grid Code]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Great Britain Grid Code
Context triple: [National Grid plc, gridCodeAuthority, Great Britain Grid Code]
  • A. OS National Grid
    OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
  • B. British National Grid
    The British National Grid is the Ordnance Survey’s coordinate reference system used to map and locate positions across Great Britain with high precision.
  • C. South Western Electricity Board
    The South Western Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity across the south-west of England before industry privatization.
  • D. Northern Powergrid
    Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
  • E. Southern Electricity Board
    The Southern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity to consumers in the southern part of England before industry privatization.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Great Britain Grid Code
Triple: [National Grid plc, gridCodeAuthority, Great Britain Grid Code]
Generated description
The Great Britain Grid Code is a technical regulatory framework that sets out the rules and standards for operating, maintaining, and developing the electricity transmission system in Great Britain.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Great Britain Grid Code
Target entity description: The Great Britain Grid Code is a technical regulatory framework that sets out the rules and standards for operating, maintaining, and developing the electricity transmission system in Great Britain.
  • A. OS National Grid
    OS National Grid is the national coordinate reference system used in Great Britain for accurately mapping and locating geographic features.
  • B. British National Grid
    The British National Grid is the Ordnance Survey’s coordinate reference system used to map and locate positions across Great Britain with high precision.
  • C. South Western Electricity Board
    The South Western Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity across the south-west of England before industry privatization.
  • D. Northern Powergrid
    Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
  • E. Southern Electricity Board
    The Southern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity to consumers in the southern part of England before industry privatization.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridCodeAuthority
Context triple: [National Grid plc, gridCodeAuthority, Great Britain Grid Code]
  • A. districtCode
    Indicates that an entity is associated with, or identified by, a specific administrative district code.
  • B. hasLocalGovernmentCode
    Indicates that an entity is associated with a specific code assigned by a local government authority for identification or administrative purposes.
  • C. FIPSCode
    Indicates the standardized Federal Information Processing Standards (FIPS) code assigned to identify a specific geographic or administrative entity.
  • D. routeNumberingAuthority
    Indicates the authority or organization responsible for assigning and managing the official number designation of a route.
  • E. hasGovernorateCode
    Indicates that an entity is associated with a specific governorate through a designated code.
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8422ddf881908a3f8f876c9f53aa completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd0862b34c819097cb7c1777313925 completed April 1, 2026, 11:58 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0b22ff5d881909ed5ac15ad8cbbb6 completed April 4, 2026, 6:39 a.m.
NEDg Description generation batch_69d0b441ca5c81908d6d50f271de2a57 completed April 4, 2026, 6:48 a.m.
NED2 Entity disambiguation (via description) batch_69d0b4e909308190a2dc31fc1ec27e09 completed April 4, 2026, 6:51 a.m.
PD Predicate disambiguation batch_69cc7a5aeb748190afb89c6bbd2a6d6f completed April 1, 2026, 1:52 a.m.
PDg Predicate description generation batch_69cc94b796788190816b71b1e9996288 completed April 1, 2026, 3:44 a.m.
Created at: March 30, 2026, 7:35 p.m.