Triple

T9285628
Position Surface form Disambiguated ID Type / Status
Subject Earthquake Game E223387 entity
Predicate rescheduledResult P374 FINISHED
Object Oakland Athletics win LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oakland Athletics win | Statement: [Earthquake Game, rescheduledResult, Oakland Athletics win]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: rescheduledResult
Context triple: [Earthquake Game, rescheduledResult, Oakland Athletics win]
  • A. scheduledAs
    Indicates that one entity is assigned or arranged to occur or function in the role, time, or capacity specified by another entity within a schedule.
  • B. postponementReason
    Indicates the reason or cause for which an event, action, or decision has been delayed or rescheduled.
  • C. result chosen
    Indicates that one entity is produced, caused, or brought about as an outcome or consequence of another entity or process.
  • D. scheduledToDetermine
    Indicates that something has been planned or arranged in advance to make a decision or establish an outcome at a specified time.
  • E. reservationState
    Indicates the current status or phase of a reservation within its lifecycle (e.g., pending, confirmed, canceled, completed).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8422ddf881908a3f8f876c9f53aa completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd081fe8cc8190b6c1b481c7129689 completed April 1, 2026, 11:57 a.m.
PD Predicate disambiguation batch_69cc7a576ec88190bbb787eb82e2e539 completed April 1, 2026, 1:52 a.m.
Created at: March 30, 2026, 7:35 p.m.