Triple

T928416
Position Surface form Disambiguated ID Type / Status
Subject Space Shuttle Discovery E20037 entity
Predicate notableMission P68 FINISHED
Object STS-133 E112005 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-133 | Statement: [Space Shuttle Discovery, notableMission, STS-133]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-133
Context triple: [Space Shuttle Discovery, notableMission, STS-133]
  • A. STS-133 chosen
    STS-133 was a 2011 NASA Space Shuttle mission that delivered supplies and the Permanent Multipurpose Module to the International Space Station as part of the final flights of the shuttle program.
  • B. STS-135
    STS-135 was the final mission of NASA’s Space Shuttle program, flown by Atlantis in 2011 to resupply the International Space Station and conclude the shuttle era.
  • C. STS-125
    STS-125 was NASA’s final Space Shuttle servicing mission to upgrade and repair the Hubble Space Telescope, extending its scientific capabilities and operational life.
  • D. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • E. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493af3dc48190adb7263e6e445ea1 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b34775ac8190aabbd047a36cec6b completed March 1, 2026, 9:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac3b9d72c8819099082daaf7d0ca3f completed March 7, 2026, 2:52 p.m.
Created at: March 1, 2026, 7:40 p.m.