Triple

T928136
Position Surface form Disambiguated ID Type / Status
Subject National Highway System E20031 entity
Predicate instanceOf P0 FINISHED
Object United States infrastructure network C4130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: United States infrastructure network
Context triple: [National Highway System, instanceOf, United States infrastructure network]
  • A. transport infrastructure network chosen
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • B. freight railroad network
    A freight railroad network is an interconnected system of rail lines, terminals, and supporting infrastructure designed to transport goods and raw materials efficiently between industrial, commercial, and logistical hubs.
  • C. region of the United States
    A region of the United States is a geographically or culturally defined area within the country that shares common characteristics such as climate, history, economy, or social identity.
  • D. infrastructure
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • E. U.S. state
    A U.S. state is a constituent political entity within the United States that possesses its own government, defined territory, and certain sovereign powers under the federal system established by the U.S. Constitution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493af3dc48190adb7263e6e445ea1 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.