Triple

T9256804
Position Surface form Disambiguated ID Type / Status
Subject Beijing–Shanghai High-Speed Railway E222463 entity
Predicate primaryRollingStock P1305 FINISHED
Object CRH380A E272095 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CRH380A | Statement: [Beijing–Shanghai High-Speed Railway, primaryRollingStock, CRH380A]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CRH380A
Context triple: [Beijing–Shanghai High-Speed Railway, primaryRollingStock, CRH380A]
  • A. CRH380A EMU chosen
    The CRH380A EMU is a high-speed electric multiple unit train used in China’s railway network, designed for rapid intercity passenger service at speeds of up to around 380 km/h.
  • B. CRH
    CRH is the China Railway High-speed service and branding used for China's network of high-speed passenger trains.
  • C. CRH3 EMU
    The CRH3 EMU is a high-speed electric multiple unit train used in China’s railway network, derived from Siemens Velaro technology and designed for operation at speeds up to around 350 km/h.
  • D. CRH6A EMU
    The CRH6A EMU is a high-speed electric multiple unit train used in China for intercity passenger services.
  • E. CRH2 EMU
    The CRH2 EMU is a high-speed electric multiple unit train used in China’s railway network, derived from Japan’s Shinkansen technology and designed for fast, long-distance passenger service.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841e4cd481908e738c74e958eaea completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cd06b4e2048190af0d65b904677c36 completed April 1, 2026, 11:51 a.m.
NED1 Entity disambiguation (via context triple) batch_69d09be75fd88190b6e99b0884dcc14c completed April 4, 2026, 5:04 a.m.
Created at: March 30, 2026, 7:32 p.m.