Triple
T9255409
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Guangzhou Nansha New Area |
E222428
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | development zone |
C5755
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: development zone Context triple: [Guangzhou Nansha New Area, instanceOf, development zone]
-
A.
infrastructure development zone
An infrastructure development zone is a designated geographic area prioritized for the planning, investment, and construction of essential public facilities and services—such as transportation, utilities, and communications—to support economic growth and urban or regional development.
-
B.
economic and technological development zone
chosen
An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
-
C.
development corridor
A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
-
D.
development regulation
Development regulation is the set of laws, policies, and administrative procedures that govern how land and resources may be used, altered, or built upon to guide orderly, sustainable, and equitable growth.
-
E.
development authority
A development authority is an organization or governmental body responsible for planning, regulating, and facilitating land use, infrastructure, and urban or regional development within a designated area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca841e4cd481908e738c74e958eaea |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 7:31 p.m.