Triple

T9246158
Position Surface form Disambiguated ID Type / Status
Subject Puente de la Mujer E222200 entity
Predicate instanceOf P0 FINISHED
Object cantilever spar cable-stayed bridge C6276 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cantilever spar cable-stayed bridge
Context triple: [Puente de la Mujer, instanceOf, cantilever spar cable-stayed bridge]
  • A. cable-stayed bridge chosen
    A cable-stayed bridge is a type of bridge in which the deck is directly supported by multiple cables connected to one or more towers or pylons, efficiently distributing loads and allowing for long spans with a distinctive, fan-like or harp-like appearance.
  • B. cantilever bridge
    A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
  • C. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • D. box girder bridge
    A box girder bridge is a type of bridge whose main load-bearing structure consists of hollow, box-shaped girders that provide high strength and torsional rigidity for spanning medium to long distances.
  • E. twin-span bridge
    A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca841d2b18819089f9faf5b2c2aec0 completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 7:30 p.m.