Triple
T9239355
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Marxism and Vietnamese Culture |
E222018
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cultural theory book |
C5140
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cultural theory book Context triple: [Marxism and Vietnamese Culture, instanceOf, cultural theory book]
-
A.
cultural study
chosen
A cultural study is an interdisciplinary analysis of how cultural practices, beliefs, symbols, and power relations shape and are shaped by social, historical, and political contexts.
-
B.
art theory book
An art theory book is a scholarly text that explores the principles, concepts, and critical frameworks used to understand, interpret, and evaluate works of art.
-
C.
sociology book
A sociology book is a written work that systematically explores human societies, social behavior, institutions, and cultural patterns using sociological theories and research.
-
D.
anthropology book
An anthropology book is a written work that systematically explores human cultures, societies, and biological or social evolution using the theories and methods of anthropology.
-
E.
film theory book
A film theory book is a scholarly text that analyzes the aesthetics, techniques, meanings, and cultural contexts of cinema through various critical and theoretical frameworks.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83ee26cc81909ac624e190597d6d |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 7:30 p.m.