Triple
T923019
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ottoman dynasty |
E19923
|
entity |
| Predicate | abolishedOfficeDate |
P3903
|
FINISHED |
| Object | 1 November 1922 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1 November 1922 | Statement: [Ottoman dynasty, abolishedOfficeDate, 1 November 1922]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: abolishedOfficeDate Context triple: [Ottoman dynasty, abolishedOfficeDate, 1 November 1922]
-
A.
dateAbolished
chosen
Indicates the date on which something (such as an institution, law, practice, or position) was officially ended or abolished.
-
B.
officeholderEndTime
Indicates the time or date at which a person’s term in a particular office or position comes to an end.
-
C.
decommissionedDate
Indicates the date on which an entity was formally taken out of service or retired from active use.
-
D.
combinedOfficeExistedUntil
Indicates that a merged or joint office or position remained in existence up to a specified end time or date.
-
E.
ceasedToBeOfficialOrganOf
Indicates that an entity stopped serving as the official organ or representative body of another entity.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493a099788190a696d9d8408cbaf4 |
completed | March 1, 2026, 7:29 p.m. |
| NER | Named-entity recognition | batch_69a4b314f6fc81908a3ccc2e741e3c2b |
completed | March 1, 2026, 9:43 p.m. |
| PD | Predicate disambiguation | batch_69a4b295b02481908e5f53bfcb83cc94 |
completed | March 1, 2026, 9:41 p.m. |
Created at: March 1, 2026, 7:40 p.m.