Triple

T921181
Position Surface form Disambiguated ID Type / Status
Subject Burke Centre E19886 entity
Predicate instanceOf P0 FINISHED
Object planned residential community C5974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned residential community
Context triple: [Burke Centre, instanceOf, planned residential community]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. neighborhood
    A neighborhood is a geographically localized community within a larger city or town, characterized by shared residential spaces, social interactions, and common amenities.
  • C. unincorporated community
    An unincorporated community is a populated area that lacks its own municipal government and is instead administered as part of a larger political subdivision, such as a county or township.
  • D. resort community
    A resort community is a residential area developed around leisure and vacation amenities—such as beaches, golf courses, spas, or ski facilities—where people live full- or part-time to enjoy a resort-style lifestyle.
  • E. urban-type settlement
    An urban-type settlement is a semi-urban locality that exhibits some characteristics of a town or small city—such as concentrated housing, infrastructure, and non-agricultural employment—without meeting all the criteria for full city status.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493a099788190a696d9d8408cbaf4 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.