Triple

T9202418
Position Surface form Disambiguated ID Type / Status
Subject Morgenthau Plan E220877 entity
Predicate instanceOf P0 FINISHED
Object World War II-era proposal C14412 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II-era proposal
Context triple: [Morgenthau Plan, instanceOf, World War II-era proposal]
  • A. World War II-era policy chosen
    A World War II-era policy is a governmental or institutional rule, strategy, or directive formulated and implemented between roughly 1933 and 1945 in response to the political, military, economic, and social conditions of the Second World War.
  • B. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • C. World War II-era agency
    A World War II-era agency is an organization, typically governmental or intergovernmental, established during the Second World War to coordinate military, economic, intelligence, or civilian efforts in support of the war.
  • D. World War II military plan
    A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
  • E. World War II-era decoration
    A World War II-era decoration is an official medal, ribbon, or insignia awarded by a nation or military organization during or immediately after World War II to recognize acts of valor, service, or participation in the conflict.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83e8e9248190862cf3e41693b310 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:26 p.m.