Triple

T919048
Position Surface form Disambiguated ID Type / Status
Subject Leadership in Energy and Environmental Design E19840 entity
Predicate instanceOf P0 FINISHED
Object green building certification system C5961 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: green building certification system
Context triple: [Leadership in Energy and Environmental Design, instanceOf, green building certification system]
  • A. green building certification level
    A green building certification level represents the degree to which a building meets defined sustainability and environmental performance standards set by a recognized rating system.
  • B. greenway
    A greenway is a linear, often vegetated corridor of land or water designed primarily for recreation, conservation, and non-motorized transportation.
  • C. library building program
    A library building program is an organized initiative that plans, funds, designs, and constructs or renovates library facilities to meet community information, learning, and cultural needs.
  • D. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • E. architectural design
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493a099788190a696d9d8408cbaf4 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.