Triple

T918732
Position Surface form Disambiguated ID Type / Status
Subject Skyfari aerial tram E19832 entity
Predicate instanceOf P0 FINISHED
Object gondola lift C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: gondola lift
Context triple: [Skyfari aerial tram, instanceOf, gondola lift]
  • A. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • B. Ferris wheel
    A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
  • C. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • D. vertical-lift bridge
    A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
  • E. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493a099788190a696d9d8408cbaf4 completed March 1, 2026, 7:29 p.m.
Created at: March 1, 2026, 7:40 p.m.