Triple

T9185073
Position Surface form Disambiguated ID Type / Status
Subject Powell & Market cable car turnaround E220436 entity
Predicate instanceOf P0 FINISHED
Object cable car terminus C12095 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cable car terminus
Context triple: [Powell & Market cable car turnaround, instanceOf, cable car terminus]
  • A. cable car station chosen
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • B. railway bridge terminus
    A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
  • C. terminal station
    A terminal station is a railway or transit station where a line or service ends, requiring trains or vehicles to reverse direction or terminate their routes.
  • D. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • E. light-rail station
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83e6d77c81909862b7afef56b1bf completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:24 p.m.