Triple

T9173097
Position Surface form Disambiguated ID Type / Status
Subject Paul Doumer Bridge E220127 entity
Predicate formerNameOf P65 FINISHED
Object Long Biên Bridge E39035 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Long Biên Bridge | Statement: [Paul Doumer Bridge, formerNameOf, Long Biên Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Long Biên Bridge
Context triple: [Paul Doumer Bridge, formerNameOf, Long Biên Bridge]
  • A. Long Biên Bridge chosen
    Long Biên Bridge is a historic cantilever bridge over the Red River in Hanoi, Vietnam, renowned for its French colonial-era architecture and its role during the Vietnam War.
  • B. Can Tho Bridge
    Can Tho Bridge is a major cable-stayed bridge in southern Vietnam that spans the Hau River, significantly improving transportation links in the Mekong Delta region.
  • C. Hiền Lương Bridge
    Hiền Lương Bridge is a historic bridge over the Bến Hải River in central Vietnam, famously known for marking the division between North and South Vietnam during the Vietnam War.
  • D. Vĩnh Tuy Bridge
    Vĩnh Tuy Bridge is a major road bridge spanning the Red River in Hanoi, Vietnam, helping connect central urban districts and ease traffic congestion.
  • E. Minquan Bridge
    Minquan Bridge is a major roadway bridge in Taipei, Taiwan, carrying Minquan East and West Roads across the Keelung River and serving as an important urban traffic artery.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83e467108190abcae6a33b3d4dad completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69ccbf9fe79c819082f335c2fdd1c7d3 completed April 1, 2026, 6:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69d0549d81d88190bea0995ad0016437 completed April 4, 2026, midnight
Created at: March 30, 2026, 7:22 p.m.