Triple
T9130736
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Last Column |
E219078
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steel beam |
C12945
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steel beam Context triple: [Last Column, instanceOf, steel beam]
-
A.
steel
chosen
Steel is a strong, durable alloy primarily composed of iron and carbon, widely used in construction, manufacturing, and tools due to its high tensile strength and versatility.
-
B.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
C.
steel arch bridge
A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
-
D.
wrought-iron bridge
A wrought-iron bridge is a structure for spanning physical obstacles, such as rivers or roads, whose primary load-bearing elements are made from wrought iron, valued historically for its toughness, malleability, and resistance to fatigue.
-
E.
cast-iron bridge
A cast-iron bridge is a structure whose primary load-bearing elements are made from cast iron, typically featuring modular, prefabricated components assembled to span a gap such as a river or roadway.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83debfc0819095800583e97ab10f |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 7:18 p.m.