Triple

T9115307
Position Surface form Disambiguated ID Type / Status
Subject USS Reliant (commandeered) E218705 entity
Predicate operationalStatusAtEnd P86578 FINISHED
Object heavily damaged LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: heavily damaged | Statement: [USS Reliant (commandeered), operationalStatusAtEnd, heavily damaged]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operationalStatusAtEnd
Context triple: [USS Reliant (commandeered), operationalStatusAtEnd, heavily damaged]
  • A. operatingStatus
    Indicates whether an entity is currently functioning, active, or in service versus inactive, closed, or out of service.
  • B. statusEndsWhen
    Indicates that a particular status or condition ceases to hold when a specified event, time, or state occurs.
  • C. fullyOperationalBy
    Indicates that an entity is expected or required to be completely functional and ready for use no later than a specified time or event.
  • D. operatedUntil
    Indicates that an entity continued to function or be in operation up to a specified end time or date.
  • E. endOfSeriesStatus
    Indicates that a series, sequence, or collection has reached its final state or completion status.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83dc94ac8190b9ef42684d36ff39 completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69cca8a1340881909dc791b825e87ef2 completed April 1, 2026, 5:09 a.m.
PD Predicate disambiguation batch_69cc65fe5be081909d4470d6317b14a6 completed April 1, 2026, 12:25 a.m.
PDg Predicate description generation batch_69cc66d7bf648190b8bff5b584b84975 completed April 1, 2026, 12:29 a.m.
Created at: March 30, 2026, 7:16 p.m.