Triple

T9104552
Position Surface form Disambiguated ID Type / Status
Subject Don Mouth Naturalization and Port Lands Flood Protection Project E218444 entity
Predicate instanceOf P0 FINISHED
Object climate adaptation project C1458 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: climate adaptation project
Context triple: [Don Mouth Naturalization and Port Lands Flood Protection Project, instanceOf, climate adaptation project]
  • A. climate services framework
    A climate services framework is a structured approach that connects climate data, tools, and expertise with user needs to support informed decision-making and climate-resilient planning across sectors.
  • B. water management project chosen
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • C. climate research center
    A climate research center is an institution dedicated to studying the Earth's climate system, analyzing environmental data, and developing scientific insights to understand and address climate change.
  • D. geohazards risk reduction program
    A geohazards risk reduction program is a coordinated set of policies, practices, and interventions designed to identify, assess, and mitigate risks from geological hazards such as earthquakes, landslides, and volcanic eruptions to protect people, infrastructure, and the environment.
  • E. sustainable design project
    A sustainable design project is an initiative that plans, develops, and implements solutions minimizing environmental impact while balancing social responsibility and economic viability throughout a product, service, or system’s life cycle.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83db7448819090d0a5de842ef2ac completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:15 p.m.