Triple

T90857
Position Surface form Disambiguated ID Type / Status
Subject Interstate 66 E1824 entity
Predicate completed P1511 FINISHED
Object 1980s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1980s | Statement: [Interstate 66, completed, 1980s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: completed
Context triple: [Interstate 66, completed, 1980s]
  • A. completedIn
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • B. concluded
    Indicates that an entity has brought an event, process, discussion, or agreement to an end, often after reaching a decision or final judgment.
  • C. passed
    Indicates that one entity successfully transferred control, responsibility, or an item (such as an object, message, or test) to another entity or through a specified stage or condition.
  • D. achieved
    Indicates that an entity successfully reached, obtained, or accomplished a specified goal, result, or state.
  • E. constructionCompleted chosen
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a24d1a97dc819094e6c021fe9b05a7 completed Feb. 28, 2026, 2:04 a.m.
NER Named-entity recognition batch_69a24feef1b08190bb9525f71cce053e completed Feb. 28, 2026, 2:16 a.m.
PD Predicate disambiguation batch_69a24eb82d408190b0f9c786152e8e4c completed Feb. 28, 2026, 2:11 a.m.
Created at: Feb. 28, 2026, 2:07 a.m.