Triple

T908325
Position Surface form Disambiguated ID Type / Status
Subject Spring Hill, Tennessee E19600 entity
Predicate hasManufacturingPlant P5255 FINISHED
Object General Motors Spring Hill Manufacturing E79633 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: General Motors Spring Hill Manufacturing | Statement: [Spring Hill, Tennessee, hasManufacturingPlant, General Motors Spring Hill Manufacturing]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: General Motors Spring Hill Manufacturing
Context triple: [Spring Hill, Tennessee, hasManufacturingPlant, General Motors Spring Hill Manufacturing]
  • A. General Motors Flint Assembly Plant
    General Motors Flint Assembly Plant is a major automotive manufacturing facility in Flint, Michigan, historically known for producing a wide range of GM vehicles and playing a central role in the city’s industrial economy.
  • B. GM Silao Assembly Plant
    GM Silao Assembly Plant is a General Motors automotive manufacturing facility located in Silao, Guanajuato, Mexico, known for producing full-size pickup trucks and related components for global markets.
  • C. General Motors Technical Center
    The General Motors Technical Center is a landmark mid-20th-century corporate research and design campus in Warren, Michigan, celebrated as a masterpiece of modernist architecture and planning.
  • D. Highland Park Ford Plant
    The Highland Park Ford Plant is a historic automobile factory in Michigan renowned as the birthplace of the moving assembly line that revolutionized mass production in the early 20th century.
  • E. Spring Hill Assembly Plant chosen
    Spring Hill Assembly Plant is a General Motors automotive manufacturing facility in Spring Hill, Tennessee, known for producing a variety of GM vehicles and powertrains.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasManufacturingPlant
Context triple: [Spring Hill, Tennessee, hasManufacturingPlant, General Motors Spring Hill Manufacturing]
  • A. mainManufacturingSite chosen
    Indicates the primary location where an entity’s products are manufactured or produced.
  • B. hasMajorProductionSystem
    Indicates that an entity primarily operates, utilizes, or is characterized by a particular major production system.
  • C. hasIndustrialPark
    Indicates that a location or entity possesses or contains an industrial park within its area or jurisdiction.
  • D. hasRefinery
    Indicates that one entity possesses, operates, or is associated with a refinery facility used for processing raw materials.
  • E. hasHeadquartersBuilding
    Indicates that an organization possesses a specific building that serves as its headquarters location.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4939f91a08190ba68c2c81eab90fe completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4b3bcad2481908b83575b2fb80d14 completed March 1, 2026, 9:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69a7c73b3a848190859df2eed9a21fc5 completed March 4, 2026, 5:46 a.m.
PD Predicate disambiguation batch_69a4b28ff5948190982c4439eadf9d87 completed March 1, 2026, 9:41 p.m.
Created at: March 1, 2026, 7:39 p.m.