Triple

T9082701
Position Surface form Disambiguated ID Type / Status
Subject Mono River basin E217672 entity
Predicate hydropowerPlant P15311 FINISHED
Object Nangbeto Dam E775708 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nangbeto Dam | Statement: [Mono River basin, hydropowerPlant, Nangbeto Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nangbeto Dam
Context triple: [Mono River basin, hydropowerPlant, Nangbeto Dam]
  • A. Nangbeto Dam chosen
    Nangbeto Dam is a hydroelectric and irrigation dam on the Mono River in West Africa, jointly developed by Togo and Benin to generate power and support regional water management.
  • B. Pracana Dam
    Pracana Dam is a hydroelectric and water management dam located on the Ocreza River in central Portugal, contributing to the regulation and use of resources in the Tagus River basin.
  • C. Saguling Dam
    Saguling Dam is a major hydroelectric and multipurpose dam in West Java, Indonesia, forming one of the key reservoirs on the Citarum River.
  • D. Pantabangan Dam
    Pantabangan Dam is a major multi-purpose dam in the Philippines known for irrigation, flood control, and hydroelectric power generation in Central Luzon.
  • E. Pangue Dam
    Pangue Dam is a major hydroelectric power facility in Chile, built on the Biobío River to generate electricity and support the country’s energy needs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d7a0388190ba1af89ed7ba36f9 completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69cc960a2760819084aab611eb1c43a9 completed April 1, 2026, 3:50 a.m.
NED1 Entity disambiguation (via context triple) batch_69d017baebb881908cfecd3438a17166 completed April 3, 2026, 7:40 p.m.
Created at: March 30, 2026, 7:13 p.m.