Triple
T9072221
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ridley Island Propane Export Terminal |
E217395
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | energy infrastructure facility |
C10698
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: energy infrastructure facility Context triple: [Ridley Island Propane Export Terminal, instanceOf, energy infrastructure facility]
-
A.
infrastructure facility
chosen
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
B.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
C.
energy hub
An energy hub is a centralized system or facility that integrates, converts, stores, and distributes multiple forms of energy (such as electricity, heat, and fuels) to optimize efficiency, reliability, and sustainability across connected users and infrastructures.
-
D.
Tennessee Valley Authority facility
A Tennessee Valley Authority facility is any physical installation, plant, dam, office, or infrastructure site owned, operated, or managed by the Tennessee Valley Authority for power generation, environmental stewardship, or regional development.
-
E.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83d6c14c8190bc056d927f00a2a2 |
completed | March 30, 2026, 2:08 p.m. |
Created at: March 30, 2026, 7:12 p.m.