Triple

T9072135
Position Surface form Disambiguated ID Type / Status
Subject Fairview Container Terminal E217393 entity
Predicate instanceOf P0 FINISHED
Object intermodal freight terminal C5917 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intermodal freight terminal
Context triple: [Fairview Container Terminal, instanceOf, intermodal freight terminal]
  • A. cross-border terminal
    A cross-border terminal is a transportation facility located at or near an international boundary that consolidates, processes, and transfers passengers or freight between different countries’ transport networks while handling customs, immigration, and regulatory controls.
  • B. inland port chosen
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • C. ferry terminal
    A ferry terminal is a designated facility where passengers and vehicles embark and disembark from ferries, typically providing ticketing, waiting areas, and docking infrastructure.
  • D. ground transportation facility
    A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
  • E. group of passenger rail terminals
    A group of passenger rail terminals is a collection of interconnected or related railway stations designed for boarding, alighting, and transferring passengers within a coordinated transport network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d6c14c8190bc056d927f00a2a2 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:12 p.m.