Triple

T9068591
Position Surface form Disambiguated ID Type / Status
Subject ISO TC 46/SC 9 E217305 entity
Predicate instanceOf P0 FINISHED
Object ISO technical subcommittee C18860 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ISO technical subcommittee
Context triple: [ISO TC 46/SC 9, instanceOf, ISO technical subcommittee]
  • A. ISO/IEC subcommittee
    An ISO/IEC subcommittee is a specialized working group within the joint International Organization for Standardization and International Electrotechnical Commission structure that develops, maintains, and oversees standards in a specific technical or thematic area.
  • B. technical subcommittee chosen
    A technical subcommittee is a specialized group within a larger organization tasked with analyzing, developing, and recommending solutions on specific technical issues or standards.
  • C. technical standards body
    A technical standards body is an organization that develops, maintains, and promotes agreed-upon technical specifications and protocols to ensure interoperability, safety, and consistency across industries and technologies.
  • D. ISO/IEC standard
    An ISO/IEC standard is a formally agreed-upon specification developed jointly by the International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC) that defines common requirements, guidelines, or characteristics for products, services, or systems to ensure quality, safety, interoperability, and consistency across international markets.
  • E. subcommittee of a United Nations committee
    A subcommittee of a United Nations committee is a smaller, specialized body established under a parent UN committee to focus on specific issues, conduct detailed analysis, and make recommendations to support the committee’s broader mandate.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d5a7f48190b16c1e59bd43ede0 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:11 p.m.