Triple

T9061226
Position Surface form Disambiguated ID Type / Status
Subject Henry D. Paschen E217127 entity
Predicate instanceOf P0 FINISHED
Object construction executive C11460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction executive
Context triple: [Henry D. Paschen, instanceOf, construction executive]
  • A. construction pioneer
    A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
  • B. architectural contractor
    An architectural contractor is a professional or firm responsible for managing and executing the construction of buildings according to architectural designs, specifications, and regulatory requirements.
  • C. construction management firm chosen
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • D. architect
    An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
  • E. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d4425481909a319dab847724ec completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:11 p.m.