Triple

T9051521
Position Surface form Disambiguated ID Type / Status
Subject Line 3A (Ho Chi Minh City Metro) E216893 entity
Predicate instanceOf P0 FINISHED
Object planned railway line C21436 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned railway line
Context triple: [Line 3A (Ho Chi Minh City Metro), instanceOf, planned railway line]
  • A. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • B. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • C. planned transit corridor chosen
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • D. railway route
    A railway route is a defined path or corridor along which trains operate between specified locations, following designated tracks, schedules, and operational rules.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d362e88190ae44b4e4dc194209 completed March 30, 2026, 2:08 p.m.
Created at: March 30, 2026, 7:10 p.m.