Triple

T9051485
Position Surface form Disambiguated ID Type / Status
Subject Line 1 (Ho Chi Minh City Metro) E216891 entity
Predicate partOfProject P10 FINISHED
Object Ho Chi Minh City urban rail network development E41505 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ho Chi Minh City urban rail network development | Statement: [Line 1 (Ho Chi Minh City Metro), partOfProject, Ho Chi Minh City urban rail network development]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ho Chi Minh City urban rail network development
Context triple: [Line 1 (Ho Chi Minh City Metro), partOfProject, Ho Chi Minh City urban rail network development]
  • A. Ho Chi Minh City Metro (under construction) chosen
    The Ho Chi Minh City Metro is a developing rapid transit system intended to provide modern urban rail service and alleviate traffic congestion in Vietnam’s largest city.
  • B. Vijayawada urban transport network
    The Vijayawada urban transport network is the city’s integrated public transit system, encompassing major bus terminals, city and suburban bus services, and connections to other modes of transport across Vijayawada.
  • C. Hanoi urban road network
    The Hanoi urban road network is the extensive system of streets, avenues, and highways that connects the districts of Vietnam’s capital city, facilitating daily transportation, commerce, and regional mobility.
  • D. City Rail Link
    City Rail Link is a major underground rail project in Auckland, New Zealand, designed to transform the city’s commuter rail network by creating a through-running, high-capacity rail corridor beneath the central business district.
  • E. Hanoi Metro Line 2A Cát Linh–Hà Đông
    Hanoi Metro Line 2A Cát Linh–Hà Đông is an elevated urban rail line in Hanoi and Vietnam’s first metro line, connecting central districts with the southwestern Hà Đông area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83d362e88190ae44b4e4dc194209 completed March 30, 2026, 2:08 p.m.
NER Named-entity recognition batch_69cc6b54423081908d9fd985109e336a completed April 1, 2026, 12:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfebc90bf88190bbcdab07ca93f569 completed April 3, 2026, 4:33 p.m.
Created at: March 30, 2026, 7:10 p.m.