Triple

T9029954
Position Surface form Disambiguated ID Type / Status
Subject Westronic E216142 entity
Predicate fieldOfWork P3 FINISHED
Object SCADA E270789 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SCADA | Statement: [Westronic, fieldOfWork, SCADA]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SCADA
Context triple: [Westronic, fieldOfWork, SCADA]
  • A. SCADA systems chosen
    SCADA systems are industrial control platforms that monitor and manage critical infrastructure and manufacturing processes in real time, often integrating hardware, software, and communication networks for centralized supervision.
  • B. SCDA
    SCDA is the ICAO airport code for Diego Aracena International Airport in Chile.
  • C. PLC
    The PLC is the elected legislative body of the Palestinian Authority, responsible for drafting laws and overseeing the executive in the Palestinian territories.
  • D. Electricity Infrastructure Operations Center
    The Electricity Infrastructure Operations Center is a specialized research and simulation facility at Pacific Northwest National Laboratory focused on advancing the reliability, security, and modernization of the electric power grid.
  • E. CEMS
    CEMS is a global alliance of leading business schools, multinational companies, and NGOs that collaborates to offer an internationally focused Master’s in Management and promote high-standard management education worldwide.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a5fa88819088144801b4dd7245 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc6a9e0aa881908886f453c51ecd0e completed April 1, 2026, 12:45 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfdbc662208190a3f4e6e593208c5c completed April 3, 2026, 3:24 p.m.
Created at: March 30, 2026, 7:08 p.m.