Triple
T9012258
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | West Zone of Rio de Janeiro |
E215502
|
entity |
| Predicate | transportInfrastructure |
P1777
|
FINISHED |
| Object | TransCarioca BRT corridor |
E760634
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TransCarioca BRT corridor | Statement: [West Zone of Rio de Janeiro, transportInfrastructure, TransCarioca BRT corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: TransCarioca BRT corridor Context triple: [West Zone of Rio de Janeiro, transportInfrastructure, TransCarioca BRT corridor]
-
A.
BRT TransCarioca
chosen
BRT TransCarioca is a bus rapid transit corridor in Rio de Janeiro that connects key neighborhoods and the international airport, improving high-capacity public transportation across the city.
-
B.
BRT TransOlímpica
BRT TransOlímpica is a bus rapid transit corridor in Rio de Janeiro that connects Barra da Tijuca with other key Olympic and urban areas to improve high-capacity public transportation.
-
C.
Metropolitano BRT system
The Metropolitano BRT system is Lima’s main bus rapid transit network, featuring dedicated bus lanes and high-capacity articulated buses to provide faster, more efficient public transportation across the city.
-
D.
Rio de Janeiro Metro
The Rio de Janeiro Metro is the rapid transit system serving the city of Rio de Janeiro, Brazil, providing high-capacity urban rail transport across key neighborhoods and metropolitan areas.
-
E.
Curitiba BRT system
The Curitiba BRT system is a pioneering bus rapid transit network in Curitiba, Brazil, renowned for its innovative, high-capacity, and cost-effective urban mass transit design that has influenced similar systems worldwide.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83a2bf088190986ee7a8eb90407d |
completed | March 30, 2026, 2:07 p.m. |
| NER | Named-entity recognition | batch_69cc69f846f88190af65dfcf8bdd936a |
completed | April 1, 2026, 12:42 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cfeb671e488190920fb1780e4ad48d |
completed | April 3, 2026, 4:31 p.m. |
Created at: March 30, 2026, 7:06 p.m.