Triple

T9010644
Position Surface form Disambiguated ID Type / Status
Subject Lower Monumental Dam E215460 entity
Predicate partOf P40 FINISHED
Object Federal Columbia River Power System E78455 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Federal Columbia River Power System | Statement: [Lower Monumental Dam, partOf, Federal Columbia River Power System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Federal Columbia River Power System
Context triple: [Lower Monumental Dam, partOf, Federal Columbia River Power System]
  • A. Columbia River hydropower system chosen
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • B. Snake River hydropower system
    The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
  • C. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • D. Hetch Hetchy Power System
    The Hetch Hetchy Power System is a municipal hydroelectric power network that generates and delivers clean electricity to San Francisco and surrounding public facilities.
  • E. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a2bf088190986ee7a8eb90407d completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc69c1571881908d0b144786b5ee1f completed April 1, 2026, 12:41 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfeb671e488190920fb1780e4ad48d completed April 3, 2026, 4:31 p.m.
Created at: March 30, 2026, 7:06 p.m.