Triple
T9010644
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lower Monumental Dam |
E215460
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Federal Columbia River Power System |
E78455
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Federal Columbia River Power System | Statement: [Lower Monumental Dam, partOf, Federal Columbia River Power System]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Federal Columbia River Power System Context triple: [Lower Monumental Dam, partOf, Federal Columbia River Power System]
-
A.
Columbia River hydropower system
chosen
The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
-
B.
Snake River hydropower system
The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
-
C.
Columbia Basin Project
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
D.
Hetch Hetchy Power System
The Hetch Hetchy Power System is a municipal hydroelectric power network that generates and delivers clean electricity to San Francisco and surrounding public facilities.
-
E.
Deschutes Project
The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83a2bf088190986ee7a8eb90407d |
completed | March 30, 2026, 2:07 p.m. |
| NER | Named-entity recognition | batch_69cc69c1571881908d0b144786b5ee1f |
completed | April 1, 2026, 12:41 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cfeb671e488190920fb1780e4ad48d |
completed | April 3, 2026, 4:31 p.m. |
Created at: March 30, 2026, 7:06 p.m.