Triple

T8978158
Position Surface form Disambiguated ID Type / Status
Subject Paul Brown Stadium E214449 entity
Predicate publicTransit P1288 FINISHED
Object SORTA Metro E624005 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SORTA Metro | Statement: [Paul Brown Stadium, publicTransit, SORTA Metro]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SORTA Metro
Context triple: [Paul Brown Stadium, publicTransit, SORTA Metro]
  • A. SORTA Metro chosen
    SORTA Metro is the primary public bus transit system serving Cincinnati and its surrounding Hamilton County region.
  • B. Länsimetro
    Länsimetro is a major westward extension of the Helsinki Metro that connects central Helsinki with the neighboring city of Espoo through a series of new underground stations.
  • C. Metro Rail
    Metro Rail is the urban rapid transit rail system serving Los Angeles County, providing light rail and subway services across the region.
  • D. Metro Line
    The Metro Line is a light rail transit route in Edmonton, Alberta, serving key destinations such as the city’s downtown and major educational and health institutions.
  • E. Eidan Subway
    Eidan Subway was the former name of Tokyo’s main rapid transit system, operated by the Teito Rapid Transit Authority before it became Tokyo Metro.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839ea8b88190922c6a326ffcc0d3 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc67a33c8481909125acf4b7f0a919 completed April 1, 2026, 12:32 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfc96e7eb48190a3df410b1544b997 completed April 3, 2026, 2:06 p.m.
Created at: March 30, 2026, 7:02 p.m.