Triple

T8948659
Position Surface form Disambiguated ID Type / Status
Subject Los Andes Province E213286 entity
Predicate timeZone P109 FINISHED
Object Chile Summer Time E6949 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chile Summer Time | Statement: [Los Andes Province, timeZone, Chile Summer Time]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chile Summer Time
Context triple: [Los Andes Province, timeZone, Chile Summer Time]
  • A. Chile Summer Time chosen
    Chile Summer Time is the daylight saving time period used in Chile, during which clocks are advanced one hour to provide extended evening daylight compared to standard time.
  • B. Chile Standard Time
    Chile Standard Time is the primary time zone used in central Chile, including regions such as Coquimbo, typically set at UTC−4 hours.
  • C. Paraguay Summer Time
    Paraguay Summer Time is the daylight saving time zone used in Paraguay, set one hour ahead of its standard time to align with neighboring regional schedules.
  • D. America/Santiago
    America/Santiago is the primary IANA time zone identifier used for the Santiago region of Chile, reflecting the country's standard and daylight saving time rules.
  • E. Bolivia Time
    Bolivia Time is the standard time zone used throughout Bolivia, corresponding to UTC−4 with no daylight saving time.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839843408190a39069a029a89f15 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc6709c7a48190ab503083a1d6a29f completed April 1, 2026, 12:30 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfc206550c8190abf016f25b14fa64 completed April 3, 2026, 1:35 p.m.
Created at: March 30, 2026, 6:59 p.m.